Assess
Review demand, site dimensions, connections, access and maintenance needs.
Start with connected fixtures, simultaneous flow, available dimensions, inlet and outlet levels, indoor or underground location, cleaning access and the documents required for the specific project.
Final model, price, availability and installation scope are confirmed in the approved quotation.
| Kitchen demand | Type of operation, simultaneous discharge, peak activity and connected fixtures |
|---|---|
| Available space | Length, width, height, access opening and service clearance |
| Product data | Capacity, rated flow, material, dimensions and current manufacturer submittal |
| Connections | Inlet, outlet, vent, pipe sizes, levels and existing drainage condition |
| Installation location | Indoor, outdoor, under-sink, plant area or other approved position |
| Maintenance | Safe opening, waste removal route and planned cleaning frequency |
| Responsibility | Product supply, plumbing, civil work, electrical needs, testing and handover |
Review demand, site dimensions, connections, access and maintenance needs.
Compare suitable product options, availability and installation requirements.
Complete the approved supply, connection and installation scope.
Explain access, cleaning, operating limits and the future maintenance route.
Poor access can turn routine cleaning into a disruptive job. The planning stage should consider lid clearance, safe opening, waste handling, nearby equipment and how the maintenance team will reach the unit during kitchen operations.
Send the kitchen details, dimensions, connection photographs and preferred supply route.